Projects

TES Compliance LTD have been privileged to be a part of some fantastic projects over the years including some prestigious site such as The Shard,
London’s Olympic Park and many more.

Claridges / Connaught & Bulgari Hotels

Location: Mayfair

TES Compliance have recently undertaken electrical testing for the prestige hotel Claridges, Connaught and Bulgari in Central London.

The Shard

Location: London Bridge

One of the most recognised buildings on the London skyline, The Shard was a very complex and challenging building to test due to its wide variety of occupants including a 5 star hotel, a number of restaurants, viewing platform, office space, private residences and even a private hospital.

This unique building is comprised of 95 floors, has 44 lifts and stands at approximately 306 meter tall.

Arcelormittal Orbit

Location: Stratford 

A unique building at the Olympic Park in Stratford, standing at 114.5m high with an events / observation platform giving stunning views of the Olympic Park.

County Hall

Location: South Bank, London

Home of the London Dungeon and London Aquarium and a variety of food and retail outlets the testing of London’s county hall was far from straightforward. With a tight deadline our teams worked around the clock to ensure the testing was completed on time.

The fixed wire testing of County Hall was challenging due to the multitude of occupants and age of the installation.

Louis Vuitton

Location: New Bond Street, London

One of many Louis Vuitton sites   

Since undertaking the testing we have put in place a 5 year testing plan which involves an annual visit testing 20% of the site each year to ensure our client remains fully compliant with their obligations under the Electricity at Work Regulations 1989.

The Aquatics
Centre

Location: Olympic Park

TES Compliance undertook the fixed wire testing of this impressive site in Stratford, London.

Much of the testing took place in the roof space gantries working above the huge 50 meter swimming pool.

Data Centre

Location: Amsterdam

Working on behalf of the main contractor, TES Compliance was asked to attend the Amsterdam data centre to assist with the final check’s prior to the site being occupied by technology giant, Apple.

TES was asked to carry out thermal imaging inspection of a new busbar installation under full load using an array of load banks.

BMW Plant

Location: Oxford & Swindon

The home of the new mini, TES Compliance assisted with the fixed wire testing of part of both the Oxford and Swindon production plants including the main UK data centre.

Notcutts

Location: Nationwide

We have recently been awarded the national contract to undertake portable appliance testing, fire extinguisher inspections and emergency lighting inspections across the Notcutts stock nationwide.

Makita

Location: Telford

TES have been awarded a 3 year contract to undertake the fixed wire testing and thermal imaging inspection of the Makita Production Facility in Telford

Kodak

Location: Glasgow

We have carried out a full inspection of switchgear at the Kodak building in Glasgow, the installation is 50 years old, we also carried out remedial works on the switchgear to ensure it is safe and functioning correctly.

Rodericks Dental
Practice

Location: Nationwide

TES Compliance have recently undertaken Electrical Installation Condition Reports for Rodericks Dental across their stock.

Have a project you need help with?

Do you have a project that needs electrical testing or electrical services? Need advice on your businesses premises and want to discuss how we can help? Get in touch with the TES team today and we can advise on how our electrical services can provide you with peace of mind. Cann today on 01293 912 318 or email info@tescompliance.com.